Line 4 is online at the Madurai facility, bringing total placement capacity to 240k CPH and dedicating capacity to medical and automotive Class 3 builds.
How we collapsed a 6-month NPI timeline to 11 weeks for a Tier-1 EV customer, what changed in the stackup, and the yield curve from prototype through ramp.
A plain-English walk through the state and central PLI schemes that have re-shaped the South-Indian electronics manufacturing landscape over the last 18 months.
Tooling, NRE, rework allowance, scrap, freight, duty, financing — a downloadable model that turns a quote sheet into a true landed cost per assembled board.
Excerpts and links from a recent industry feature covering our Madurai facility expansion and Pioneer Group's broader manufacturing investments.